Monthly Archives: February 2003

Bedroom 2 – The Restoration – Floating The New Ceiling

After the taping was dry, it was time to float the joints.

Posted in Bedroom 2 | Leave a comment

Foyer – The Restoration (Phase 1.2) – New Doorbell

The new mechanical doorbell arrived, so it’s time to install it.  It will go on the door frame, right near the door knob. The outside, with the old inoperable electric doorbell button removed. The shaft that goes from the outside … Continue reading

Posted in Foyer | Leave a comment

Pantry – The Restoration (Phase 1) – New Shelving

The single long shelf in the pantry just didn’t allow for very much storage.  In order to take advantage of the full 5 feet of vertical wall space above the washer and dryer, we decided to remove the single shelf … Continue reading

Posted in Pantry | Leave a comment

Bedroom 2 – The Restoration – Taping The New Ceiling

Drywall tape all installed.  Also note the new fixture box added for the ceiling fan.

Posted in Bedroom 2 | Leave a comment

Bedroom 2 – The Restoration – New Ceiling Drywall Installed

Installing the final piece of drywall. Putting in the final drywall screws.

Posted in Bedroom 2 | Leave a comment